KL Monorail Platform Screen Door (PSD)
Modernization of existing PSD total 11 stations, 22 platforms, from door mechanism, to door and station control system, interfacing with Train Control Management System (TCMS).
Mechanical scope to supply, install and modernize obsoleted motor, gearbox, belt, door hinge.
Design, fabricate and build of new Door Control Unit, platform Local Control Unit control panel.
PSD compliance with safety level SIL 2, with according to ISO 9003 standard.
Onsite cabling work to re lay power, control, communication cable at all 11 stations.
Location : Selangor, Malaysia.
Year of completion : Ongoing
Train Control and Management System (TCMS)
Main control systems of the entire monorail with redundancy system. Train Control Management System (TCMS) design, development with using Allen Bradley automation systems.
System using Allen Bradley redundant hardware, HMI, FactoryTalk® Historian, Vantage Point.
Location : Selangor, Malaysia.
Year of completion : Ongoing
Tyre Pressure Monitoring System
Improvement of monorail Tyre Pressure Monitoring Systems (TPMS) with predictive alarm algorithm, and safety level protection.
Enhance TPMS safety control and monitoring by using redundant antenna signal.
TPMS system to be compliance with SIL 0.
TPMS hardware is using PressurePro products.
Location : Selangor, Malaysia.
Year of completion : Ongoing